UK Statutory Health & Safety Storefront
Pre-authored, audit-proof CDM 2015 Principal Contractor Construction Phase Plans, DSEAR 2002 Explosion Risk Assessments, COSHH 2002 Chemical Safety Systems, and 30 Trade-Specific RAMS. Fully formatted in Microsoft Word (.docx) with HSE ALARP 5×5 quantitative risk matrices.
Built for Principal Contractors, H&S Directors & Specialist Subcontractors
Every template is authored to satisfy HSE inspector scrutiny, Principal Contractor tier-1 pre-qualification, and SSIP accreditations (CHAS, Constructionline, SafeContractor).
CDM 2015 Principal Contractor Construction Phase Plan
Under CDM 2015 Regulation 12, a Construction Phase Plan (CPP) must be drawn up before construction work begins on any project with more than one contractor. Our Master CPP Kit provides the full statutory architecture required under Regulation 13:
- Schedule 3 Particular Risks: Deep excavations, structural collapse, falls from height, buried utilities, high-voltage substations, and confined spaces.
- Pre-Construction Information (PCI): Integration protocols for geotechnical surveys, asbestos R&D registers, and underground utility searches.
- Site Rules & Welfare: Mandatory 5-point PPE, substance misuse screening protocol, and traffic management segregation.
- Building Safety Act 2022: Gateway 2 & 3 sign-offs and Golden Thread digital safety case evidence.
DSEAR 2002 Dangerous Substances & Explosion Risk
Complies with the Dangerous Substances and Explosive Atmospheres Regulations 2002 (SI 2002 No. 2776) and HSE Approved Code of Practice L138. Essential for sites handling flammable vapours, gases, combustible dusts, or high-pressure systems:
- Hazardous Area Classification (Zoning): Gas/vapour Zone 0, Zone 1, Zone 2 and combustible dust Zone 20, Zone 21, Zone 22.
- ATEX Equipment Standards: BS EN 60079 compliance for certified intrinsically safe electrical equipment and mechanical spark elimination.
- Hot Works Permit Integration: 15-metre combustible clearance, calibrated 4-gas atmosphere monitoring (LEL <5%), and 60-minute fire watch.
- Static Grounding & Bonding: Dissipative footwear (BS EN ISO 20345) and certified earth bonding clamps during fuel transfer.
COSHH 2002 Chemical & Hazardous Substances System
Enforces the Control of Substances Hazardous to Health Regulations 2002, HSE publication EH40/2005 Workplace Exposure Limits (WELs), and the 8 Principles of Good Practice for occupational chemical management:
- EH40 WEL Compliance: Statutory 8-hour TWA and 15-minute STEL exposure thresholds for respirable crystalline silica (RCS), isocyanates, and solvents.
- Local Exhaust Ventilation (LEV): Statutory 14-month thorough examination registers under COSHH Regulation 9.
- RPE Selection Matrix: EN 149 FFP3 (APF 20) and powered air-purifying respirators (APF 40) with face-fit test certificates.
- Health Surveillance: Lung function spirometry and skin inspection regimes for high-potency sensitisers.
HSE ALARP 5×5 Risk Matrix Standard
Every single hazard in our 35 documents is quantified using the HSE ALARP 5×5 Matrix (Severity 1–5 × Likelihood 1–5). Demonstrates the legal test under HSAWA 1974 Section 2 that risks are As Low As Reasonably Practicable:
- Dual Rating Method: Explicit Initial Uncontrolled Risk vs Residual Controlled Risk scores.
- Hierarchy of Risk Controls: Elimination, substitution, engineering controls, administrative procedures, and PPE.
- Mandatory Stop Work Authority (Score ≥17): Any critical score halts the task until physical hazard redesign is proven.
- Named Dutyholders: Every residual control is assigned to a certificated dutyholder (SMSTS, CPCS, CISRS, NICEIC).
Explore All 35 UK Statutory Documents & Suites
Instant Word (.docx) downloads. Each document includes document control, statutory citations, 5x5 HSE ALARP risk assessment, step-by-step sequential method statement (SSoW), plant schedules, and emergency RIDDOR protocols.
HSE Statutory Risk Rating Matrix (Severity 1–5 × Likelihood 1–5)
Mandatory under Management of Health and Safety at Work Regs 1999. Click or hover any cell to evaluate tolerability and stop-work thresholds.
RAMS: Groundworks, Trenching & Deep Excavation Operations
Excavation Support, Trench Boxes, Dewatering & Underground Services Avoidance
RAMS: Structural Steelwork Erection & Crane Lifting Operations
Primary Steel Framing, Metal Decking, Connection Torquing & Tandem Lifting
RAMS: Reinforced Concrete (RC) Frame, Falsework & Concrete Pouring
Temporary Formwork Erection, Steel Reinforcement Fixing & Boom Pump Operations
RAMS: TG20:21 Tube & Fitting Scaffolding Erection, Alteration & Dismantling
Independent Tied Scaffolding, Loading Bays, Edge Protection & Scafftag Handover
RAMS: Industrial Roofing, Standing Seam Sheeting & Wall Cladding
Composite Panel Installation, Safety Netting, Fragile Roof Controls & Guttering
RAMS: Soft Strip Demolition & Controlled Structural Deconstruction
Internal Non-Structural Strip-Out, Structural Propping, Drop Zones & Waste Segregation
RAMS: Low-Voltage (LV) Switchgear Installation, Busbar Trunking & Live Testing
Main Distribution Boards, Sub-Mains Cabling, Dead/Live Testing & Dead-Front Commissioning
RAMS: 11kV/33kV High-Voltage (HV) Substation, Transformer & Cable Jointing
High-Voltage Switching, Containment, Oil-Filled Transformer Positioning & Earthing
RAMS: Commercial Plumbing, Sanitary Pipework & Deep Drainage Installation
Cast Iron Soil Stacks, Water Mains, Fusion-Welded Drainage & Manhole Connections
RAMS: Commercial HVAC Plant Installation, Galvanised Ductwork & Chiller Positioning
Rooftop Chiller Rigging, AHU Assembly, Spiral Ductwork Hanging & Refrigerant Charging
RAMS: Mobile Elevating Work Platform (MEWP / Scissor & Boom) Operations
IPAF-Operated Articulated Booms, Electric Scissors, Ground Condition Checks & Rescue Plans
RAMS: Tower Crane Erection, Climbing, Operation & Blind Tandem Lifting
BS 7121 Part 5 Lifting Plans, Wind Speed Monitoring, Anti-Collision Systems & Slinger Signalling
RAMS: Unitised Curtain Walling, Rainscreen Cladding & External Glazing
High-Level Bracketry, Spider Glazing, Monorail Hoists & Suction Lifter Operations
RAMS: Continuous Flight Auger (CFA) & Rotary Bored Piling Foundation Works
Rig Stability, Working Platforms (BRE 470), Concrete Injection & Rebar Cage Insertion
RAMS: External Brickwork, Dense Blockwork & Architectural Masonry
Mortar Silos, Cavity Insulation, Helical Ties, Windposts & High-Level Hop-Up Scaffold
RAMS: Drylining, Metal Stud Partitioning & MF Suspended Ceiling Systems
Board Lifting Trolleys, Drywall Screwing, Acoustic Insulation & Mineral Fibre Grid Installation
RAMS: 1st & 2nd Fix Carpentry, Structural Timber Framing & Roof Truss Erection
Timber Floor Joists, Truss Crane Hoisting, Nail Guns, Saws & Door Set Installations
RAMS: Commercial Painting, Intumescent Fire Protection & Airless Spray Coating
Steelwork Fireproofing (30/60/120 Min), High-Pressure Airless Spray, VOC & Mist Control
RAMS: Liquid-Applied Polyurea, Polyurethane & Hot-Melt Structural Waterproofing
Heated Plural-Component Rigs, Substrate Priming, Inverted Roofs & Toxic Vapour Protection
RAMS: Diamond Core Drilling, Track Sawing, Floor Sawing & Hydraulic Crushing
Wet-Cut Slurry Capture, Hand-Arm Vibration (HAVS), Silica Dust (RCS) & Heavy Concrete Stitching
RAMS: Non-Licensed Asbestos Removal & Textured Coating (Artex) Remediation
CAR 2012 Regulation 3(2) & HSE EM2 Controls, Fibre Suppression, Type 5/6 Coveralls & Waste Transit
RAMS: Confined Space Entry, Culvert Inspection & Deep Sewer Chamber Works
Tripod & Winch Recovery, Continuous 4-Gas Detection, Escape Breathing Apparatus & Top-Man Sentry
RAMS: Traction Passenger Lift Shaft Installation & Escalator Rigging
Lift Shaft False Cars, Counterweight Rigging, Guide Rail Alignment & Motor Room Hoisting
RAMS: Passive Fire Stopping, Cavity Barriers & Service Penetration Sealing
Ablative Batt, Intumescent Mastic, Pipe Collars, Drop Barriers & Building Safety Act Compliance
RAMS: High-Pressure Water Jetting (10,000+ PSI) & Industrial Drain De-Scaling
WJA Code of Practice, Dump Guns, Hose Anti-Burst Shrouds, Blast Exclusion Zones & Eye Protection
RAMS: Bituminous Torch-On Reinforced Felt & Single-Ply Membrane Flat Roofing
Safe2Torch Protocol, LPG Gas Cylinder Safety, 2-Hour Post-Flame Fire Watch & Edge Guardrails
RAMS: Overhead Structural Glazing, Glass Atriums & Spider Bracket Installation
Vacuum Glass Lifters, Winch Taglines, Crash Decks, Glazing Robots & Wind Gust Constraints
RAMS: Site Hot Works, Oxy-Fuel Cutting & Structural Welding
Hot Work Permit Protocol, Flashback Arrestors, Welding Fume Extraction (HSE STGO01) & Fire Watch
RAMS: Construction Site Traffic Management, Plant Segregation & Delivery Logistics
HSG144 Segregation, Reversing Marshals, Turning Circles, Pedestrian Walkways & Wheel Wash
RAMS: Building Services MEP Hydrostatic Pressure Testing, Chemical Flushing & Chlorination
PSSR 2000 Test Enclosures, Pressure Relief Calibration, Chemical Biocide Dosing & Safe Discharge
CDM 2015 Construction Phase Plan Master Kit
The Authoritative Principal Contractor CDM 2015 Statutory Compliance Suite
COSHH Compliance Master System
Complete Chemical Safety, LEV Inspection, Health Surveillance & SDS Management Suite
High-Risk Trade RAMS Gold Suite
Tier 1 Pre-Qualification Safety Suite: Height, Lifting, Confined Space, Hot Works & PTW
Demolition & Groundworks Contractor Suite
Integrated Enabling Works Master Kit: Deep Trenching, Structural Stripping, Plant & Utility Avoidance
Building Envelope & Façade Safety Package
Comprehensive Curtain Walling, High-Level Cladding, Roofing & Building Safety Act 2022 Dossier
Statutory Dutyholder Responsibilities Matrix
How our document library maps to your legal obligations under the Construction (Design and Management) Regulations 2015.
Principal Contractor
Must draw up, implement, and review the Construction Phase Plan. Coordinate all trade subcontractors, ensure site welfare facilities, and enforce site rules and mandatory inductions.
Principal Designer
Plan, manage, and monitor health and safety in the pre-construction phase. Identify, eliminate, or control foreseeable risks and assist the client in preparing Pre-Construction Information (PCI).
Trade Subcontractors
Plan and manage their own work. Provide trade-specific RAMS aligned with the Principal Contractor Construction Phase Plan. Verify worker competency (CSCS, CPCS, CISRS, NICEIC).
Commercial Client
Appoint the Principal Designer and Principal Contractor in writing. Ensure suitable management arrangements and allow sufficient time and resources before construction commencement.
Why Tier-1 Principal Contractors Choose Our Library
Every document in this storefront has been authored and reviewed by Chartered Safety and Health Practitioners (CMIOSH) and DipNEBOSH specialists with extensive field experience across civil engineering, high-voltage substations, structural steelwork, and passive fire safety.
Pre-Qualification Accreditation Ready
Designed to pass stage 1 audit assessments across all Safety Schemes in Procurement (SSIP) member schemes:
Frequently Asked Questions (UK Storefront)
Common questions regarding our UK statutory documents, CDM 2015 compliance, and delivery formats.
What format are the documents delivered in?
All 35 UK compliance documents and master packs are delivered as fully editable Microsoft Word (.docx) files. There are no password locks, proprietary software restrictions, or watermarks. You can insert your company logo, project directory, site specifics, and contractor details immediately.
Do these documents comply with the Building Safety Act 2022?
Yes. Our CDM 2015 Construction Phase Plan Master Kit and high-risk structural packages are structured to support the Golden Thread of building information and Gateway 2/3 statutory submissions for Higher-Risk Buildings (HRBs).
How does the HSE ALARP 5x5 Matrix work?
Each hazard is scored initially (Uncontrolled Risk) on a 1–5 Severity and 1–5 Likelihood scale. The document then outlines the hierarchy of risk controls (Elimination, Engineering, Administrative, PPE) and calculates the Residual Controlled Risk. Any initial risk score of 17 or greater triggers a mandatory Stop Work Authority until structural engineering mitigations are in place.
How soon do I receive my document after payment?
Instantly. Upon completing secure payment via Stripe (Credit Card, Debit Card, or Apple Pay), a secure download token is generated and your Microsoft Word (.docx) document is made available immediately on the confirmation page and emailed to your address.
Equip Your UK Construction Site with Audit-Ready Safety Systems
Save dozens of consulting hours. Download pre-authored, CMIOSH peer-reviewed CDM 2015 Construction Phase Plans, DSEAR assessments, COSHH systems, and trade RAMS today.
Browse All 35 UK Documents & Master Packs →